INMENA
Back to catalog
Geotec Mud Tank
Fabrication

Geotec Mud Tank

2,000-liter mud control system

  • 2,000 L
  • Mud Control
  • Corrosion-Resistant
Materials
SAE 1020 carbon steel, anti-corrosive epoxy coating.
Production Time
10–15 business days

Description

Mud containment and treatment tank for geotechnical drilling operations, with an integrated work platform and corrosion-resistant coating.

Technical blueprint — coming soon
Interactive 3D model — coming soon